JiangYin XiangGu Hardware Products Co.,Ltd

JiangYin XiangGu Hardware Products Co.,Ltd Focus on supplying high quality fasteners.

Manufacturer from China
Active Member
4 Years
Home / Products / Stud Threaded Rod /

Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

Contact Now
JiangYin XiangGu Hardware Products Co.,Ltd
Country/Region:china
Contact Person:MrJason
Contact Now

Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

Ask Latest Price
Video Channel
Brand Name :XGFH
Model Number :ASME B18.31.1M
Certification :ISO9001,EN10204 3.1Certificate
Place of Origin :China
MOQ :100pcs
Price :0.1-5usd/pc
Payment Terms :T/T, L/C
Supply Ability :100000pcs per month
Delivery Time :3-10workdays
Packaging Details :5-20pcs per bind, and pallet.
Name :Double end studs
Material :Medium Carbon Steel
Grade :Class 5
Finish :Black Oxide
Specification :DIN939
System of Measurement :Imperial (Inch)
Thread :Coarse
Tensile strength :125,000psi
Thread Requirement :2A
Hardness :HRC 22 min.
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Product Description:

Setup Studs Grade 5 Steel Black Oxide Double End Studs

Setup Studs Grade 5 Steel Black Oxide Double End Studs Made In China.

We offer low carbon steel, medium carbon steel, alloy steel, stainless steel and brass, aluminum alloy Threaded Rods and Studs.

Studs can be heated, oxidized black, galvanized, hot bucket galvanized, black zinc, copper plating, nickel plating, chromium plating, Dakota and other treatments to meet various corrosion resistance or strength requirements.

Please state this requirement in your inquiry.

Products name Setup Studs Grade 5 Steel Black Oxide Double End Studs
Standard: DIN,ASTM/ANSI JIS EN ISO,AS,GB
Material Carbon Steel:Q235,#45,35CrMo,42CrMo,40Cr;Stainless Steel:SS304, SS316,SS316L
Steel Grade: Grade B7,B16,L7,B8,B8M;Class 8.8,10.9,12.9;Grade 2,5,8.
Finishing Black Oxide,HDG(Hot Dip Galvanized),Zinc Plated,Dacromet,PTFE
Related Products Hex nuts,Hex flange nuts,Slotted Nuts and Washers
Application

Secure setup clamps and fixtures to your machine table,or assemble heavy machines,such as engine mounts.

These studs act as a pilot when connecting parts since they’re headless,which eases installation.

Unlike a bolt,which has a head,they let you access parts from either end,but they require nuts to hold the part.

Pair them with a T slot or flanged nut when securing to a machine table.Or,put a nut on before your part to work as a float,allowing you to adjust the height of your part.The unthreaded middles is useful for gripping and adjusting.

Also known as double ended studs.

Stock Products Studs in stock with Black Oxide,Zinc Plated,Yellow Zinc and HDG
Get Free Samples for standard fastener from Jiangyin XiangGu Hardware Products Co.,Ltd
Focus On Supplying High Quality Fasteners.

Product Drawing:

Metric Clamping-Type Studs Table 2
ASME/ANSI B18.31.1M

Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

d(mm) P(mm) b(mm) U(mm)
L≤250 250<L≤400 L>400 max
M6 1 18 24 / 2
M8 1.25 18 24 / 2.5
M10 1.5 26 32 45 3
M12 1.75 30 36 49 3.5
M14 2 34 40 53 4
M16 2 38 44 57 4
M20 2.5 46 52 65 5
M24 3 54 60 73 6
M30 3.5 66 72 85 7
M36 4 78 84 97 8
M42 4.5 90 96 109 9
M48 5 / 108 121 10
M56 5.5 / 124 137 11
M64 6 / 140 153 12
M72 6 / 156 169 12
M80 6 / 172 185 12
M90 6 / / 205 12
M100 6 / / 225 12


Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 SteelBlack Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

Black Oxide m8 80mm Double End Stud Threaded Rod Setup Grade 5 Steel

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory and OEM are available.

Q: How long is your delivery time?

A: Generally it is 2-5 days if the goods are in stock,or it is 15-30 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 30% T/T in advance ,balance before shipment or L/C.
If you have another question, please feel free to contact us.

Inquiry Cart 0